It is specially designed and formulated to carry out on site repairs.
It is very easy and fast to apply.
Once applied, it only requires 30 minutes to 1 hour, to be in conditions for putting the conveyor belt or Repaired rubber lining into operation, thereby saving time and operating costs, thus repairing components in short plant stops and as a consequence an increase in the meantime between failures.